Complete industrial robot systems for UK manufacturers

Automation project brief guide

Robot-cell specification checklist: the information that improves every proposal.

A clear brief helps an integrator choose the right architecture, expose assumptions early and propose a cell that can be tested against your real production needs.

Red and black robot arm on a dark grid background.
ProductSize, mass, variation and presentation
ProductionTask, quality, output and operating pattern
ProjectSite, interfaces, acceptance and delivery

Technical guidance by Oxford Industrial Automation. Updated 25 August 2026.

Start with evidence from the current process.

A short process video, layout drawing, product data and representative samples often answer more useful questions than a long equipment wish list. Describe the production outcome first, then separate fixed requirements from preferences.

Products and formats

Dimensions, mass, material, variability, tolerances, presentation, quality and changeover range.

Task and performance

Current method, required movements, good output, process dwell, rejects and operating hours.

Site and interfaces

Layout, access, utilities, environment, machinery, signals, networks and production downtime.

People and delivery

Operating modes, loading, changeover, maintenance, training, acceptance and support needs.

Robot-cell project brief checklist

Business objectiveConstraint to remove, quality issue, capacity need, manual-handling concern or resilience goal
Product dataDrawings, weights, materials, photographs, samples, variants and worst-case conditions
Process sequenceEvery step, decision, quality check, dwell, input, output and fault response
PerformanceGood units per period, format mix, shift pattern, planned stops and acceptance conditions
Layout and environmentFloor plan, heights, access routes, temperature, dust, washdown and available utilities
InterfacesConnected machines, conveyors, PLCs, networks, line controls and responsibility boundaries
Safety and operationAccess, loading, teaching, cleaning, maintenance, foreseeable intervention and site procedures
DeliveryDesign reviews, trials, site dates, shutdown window, training, documentation and support

Mark unknowns instead of guessing

An honest “to be confirmed” is more useful than a hidden assumption. Assign an owner and decision date to each unknown, especially where it affects product presentation, tooling, cycle, interfaces, safety or site installation.

Frequently asked questions

Clear answers for your robot project

Do I need a finished specification before contacting an integrator?

No. A concise project brief with products, current process, target output, space and constraints is enough to begin. Uncertainties can be recorded and resolved during feasibility and design.

What product data is most important?

Provide size, mass, centre of gravity where relevant, material, surface, variability, tolerances, presentation, fragility and representative worst-case samples.

How should cycle time be specified?

State required good output over a defined operating period and include format mix, product availability, process dwell, quality checks, changeovers and planned stops.

What makes quotations easier to compare?

Give each supplier the same scope, interface information and acceptance requirements, then compare assumptions, exclusions, responsibilities and lifecycle support as well as price.

Continue your research

Related robot-cell topics

Use these practical pages to compare options and prepare a useful project brief.

Start with your production task

Show us what you want to automate.

Send product details, target output, available space and a short video of the current process. We will define the next technical step.

Call 01865 416830Project enquiry